top of page
Franc w_ shadow.png

Pool Landscaping Auckland

Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.

A pool arrives on a truck and goes in with a crane in a single morning. Everything that makes it feel like part of your home happens either side of that morning — and that is the part we do.

What we build around a pool

• Excavation and site prep — set out, dig, base preparation and spoil removal.
• Engineered retaining where levels change or the pool sits into a slope.
• Coping and surrounds — concrete copings, paving and exposed aggregate.
• Decking in Vitex, Kwila, Macrocarpa or treated pine, cut to the pool line.
• Barriers and balustrades — compliant fencing, frameless glass, aluminium.
• A built equipment box for the pump and filtration, not a lid in the lawn.
• Finishing — planting, decorative pebble, lawn, lighting and power runs.

How a pool install runs

Most people are surprised how fast the pool goes in, and how much has to be right before it does.

The pool is collected from the supplier early, usually around 7:30am, and is on site by 8:15. A crane lifts it over the house or the fence and sets it into a hole that has to already be dug, based and dimensioned to an engineering drawing supplied weeks earlier. There is no adjusting on the day.

So the deck framing, the equipment box and the service runs are built before the pool exists. Install day is then a lift, a set and a level.

What costs people money

Three things turn a straightforward pool into an expensive one, and all three are cheaper to find before you dig than after.

Stormwater. We locate the existing pipe runs before setting out and keep the excavation a metre clear. Disturbing a line means an engineered solution and often a consent nobody budgeted for.

Access. The crane has to reach. On a tight site that shapes everything — where the pool can go, and sometimes whether a fence panel comes off for the morning.

Barriers. Far easier designed into the deck than bolted on at inspection.

Pools we build around

We are not a pool supplier, and that is deliberate — we build around whatever suits your site rather than whatever we happen to sell.

Fibreglass plunge pools come as a single shell and install in a morning, where the ground and the access allow a straight lift. Herne Bay was a fibreglass plunge with concrete copings, engineered retaining, an aluminium balustrade and synthetic turf.

Stainless pools are lighter, which opens up sites a heavier shell cannot reach. One Tree Hill was a stainless Outback plunge in a half-moon Kwila deck with frameless glass.

Consents and compliance

This is the part most people dread, and the part we take off you entirely.

We manage the engineering and the council consents ourselves. We work to the pool manufacturer’s engineering drawings, resolve barrier and balustrade compliance at the design stage rather than at inspection, and know which decisions on a site trigger a consent and which do not.

That knowledge is usually worth more than any single line item on a quote.

Where we work

Auckland-wide. Recent pool projects in Herne Bay, One Tree Hill, Meadowbank and Mission Bay, with wider landscape work across Torbay, Point Chevalier and Titirangi.

Common questions

How long does a pool project take?
Most of our projects run four to eight weeks on site. The pool itself goes in during one morning of that.

Do you supply the pool as well?
No. We build everything around it and coordinate with your pool supplier, which means you get the pool that suits your site rather than the one we stock.

Do I need a consent?
It depends on the pool, the site and what changes around it. We work that out before quoting and manage the process if one is needed.

Can you get a pool into a tight site?
Often, yes — it comes down to crane access and what the ground allows. We assess it on the first visit and tell you straight if it will not work.

Thinking about a pool? We will come to the site, walk it with you, and tell you what the ground and the access will actually allow before anyone commits to anything.

bottom of page