What a surround renovation covers
• Coping replaced — porcelain, concrete or stone, set to the pool line.
• Decking rebuilt in Vitex, Kwila, Macrocarpa or treated pine.
• Paving and tiling, including porcelain laid on the Silca System over an existing timber frame.
• Barriers brought up to standard — frameless glass, aluminium panels, compliant gates.
• Drainage corrected where water sits or runs the wrong way.
• Equipment housing rebuilt, so the pump is enclosed rather than lidded into the lawn.
• Planting, pebble, lighting and lawn to finish.
Why the surround fails before the pool does
A pool shell can sit happily for a very long time. The timber around it, coping bedded on a substrate that has moved, and a barrier built to an older standard all age faster than the water does.
Three things bring people to us. The deck has gone soft or grey and the fixings are lifting. The coping has drummed or cracked where the ground under it shifted. Or the barrier no longer complies, usually because a level, a gate or something climbable changed when another part of the section was rebuilt.
None of those need the pool touched.

What we find when we lift the old surround
Most of the cost sits under the surface, which is why we open up a section before pricing the whole thing wherever we can.
Framing. Timber against a wet edge fails at the fixings and the bearer ends first, not in the middle of the boards. What looks like a board problem is usually a frame problem.
Drainage. If water has been sitting against the structure, a new deck will fail the same way the old one did unless the fall is fixed at the same time.
Levels. A new surface is rarely the same thickness as the old one, and that changes coping heights, door thresholds and barrier compliance all at once.
Jobs we have done this way
Meadowbank was a full rebuild around an existing pool: a curved Vitex deck wrapping the water on 190 joists over double 190 bearers, fixed with J Vice stainless systems from Glass Vice on every structural connection, with porcelain coping, frameless glass and timber-edged garden beds.
Titirangi kept the deck frame and changed the surface. We laid 400 x 400 Silca grates across a strengthened frame, fixed with stainless screws, then glued 600 x 600 structural porcelain over them with 3 mm gaps, so water drains straight through rather than sitting on the surface.
One Tree Hill set a stainless plunge pool into a Kwila deck, with frameless glass finished into the boundary using two custom black aluminium panels.

Consents and compliance
A surround renovation often needs no new consent at all. Meadowbank did not — the barrier consent from before the rebuild still applied.
What changes that is the barrier. If the work alters a level, a gate, or anything climbable in the zone around the pool, the barrier has to comply on completion even if it complied before. We work that out before quoting rather than at inspection.
Where a job needs a barrier specialist or a consultant, we appoint and brief them and hold the programme together. They certify their own work.
Where we work
Auckland-wide. Recent pool and surround work in Meadowbank, Herne Bay, One Tree Hill, Titirangi and Mission Bay.
Common questions
Can you renovate the surround without touching the pool?
Yes, in most cases. The shell, the plumbing and the plant stay where they are and we work around them.
Will the barrier have to change?
Sometimes. If the work changes a level, a gate or anything climbable near the pool, the barrier has to comply on completion. We check it before quoting.
Do I need a consent?
Often not. It comes down to the barrier, and whether the work changes drainage or retaining. We work it out before pricing.
Can porcelain go over an existing timber deck?
Yes, on the Silca System, where the frame is sound or can be strengthened. That is what we did in Titirangi.
How long does it take?
Most of our projects run four to eight weeks on site. A surround renovation is usually at the shorter end of that.